Thursday, April 4, 2019
The Roles And Responsibilities Of The Design Team Construction Essay
The Roles And Responsibilities Of The Design Team Construction EssayInterior Designer Interior introductioners atomic number 18 some sentences used on contracts where the internal finish and dcor is important or of a prestigious nature. some(prenominal) high-profile house makeing purports or city-centre a crack upment conversions go through been developers in conjunction with interior designers who can issue considerable value to a project. quantity Surveyor Quantity surveyors accurately go over the amount of materials needed to build the project. They prepargon a bill of quantities establishing a temperament of all told the materials needed and identify all the tuition necessary to draught out a specification of the belongs. The quantity surveyor can then advise and prevail the architect or the client on the cost of the crease, check tenders and evaluate any(prenominal) cost as black market proceeds.Landscape Architect The landscape architect is some terms contra cted to design the external environs of the project. As with interior design, the landscape can be enhanced by a specialist to meliorate the hitd project.Resident Engineer Resident Engineers are based close to the anatomical structure change by reversal ons, on the device site itself. They report back to the structural engineer and the architect on the matters relating to the structure and the load-bearing components that birth been designed by the structural engineer.geomorphologic Engineer Structural Engineers consider the design of loadbearing elements of the build and plug that each component is designed to safely withstand the loads that are imposed on the grammatical social organization. Structural engineers typically work for the client only if are frequently engaged by the architect to depose and supervise the design and installation of structural elements as work proceeds. They work very closely with the architectural technologist and the principal assert er.Building Services Engineer Building services engineers design and execute a wave of items into the project that dont improve the resources and the quality of the make. Building services and the effective use of heat, light, acoustics and other electrical appliances book seen significant improvements in recent years and many of these items, much(prenominal) as lifts, escalators, air condition and heating and ventilation systems, need to be integrated into the contract drawings at an early put to vacate conflicts of space or to mark off that the design can accommodate machinery, send offt and equipment.Clerk of Works The shop assistant of works is employed directly by the client, who will want assurance that a asseverator is producing a building that meets specification in terms of both materials and workmanship. The shop assistant of works also reports to the architect on progress of the pull works. Clerks of works do non issue instructions and do not assimilate authority to impose variations or changes to the design but will need to inspect the works as it proceeds and hence need to visit the site frequently. On some larger sites, a clerk of works will have a resident office and spend their entire working(a) time there.Contractor Contractors per melody many duties on site and thus they are in the best localise to ensure that site activities are carried out safely. Contractors must ensure that sub asseverators have information about risks on the site and that all workers and operatives working on the project have adequate training and a capable induction to site procedures.Task 3Explain the roles and responsibilities of the product team. (Identify then describe the members of a production team, this is the team that will produce the building from the design)The Production TeamProjects ManagerSite ManagerQuantity SurveyorSite EngineerTask 4Describe the legal implications that could arise from miscommunicationLegal implications that coul d arise from miscommunication include-In terms of legal position The client is put at the top of any hierarchical chain. However, the client usually tends to place the responsibilities on the architect, the design team and the contractors.To pr tied(p)t any legal implications, architects are needful by law to hold qualifications that show that they completely understand the principles of design and can build a sufficiently strong structure. They must also accept with the legislations such as homework, building regulations and management regulations and the change and disabilities act.Furthermore, architects are ask to have adequate public liability insurance to protect any ternion parties from any defects or problems related with their work.Task 5Changes made are window size have been increased (communicate this to the production team)Write letter to (proof and backup needed, when communication has taken place)Paragraph on the opposite communicationsProduce a written commu nication between design and production team-Write specimen letter to product team about change in window sizeTell building to leave gaps for the windows (bigger gaps)Who needs to be told?QS Because specification will changeTask 6 Describe a modern method of construction look for a sustainable method employing timber or a technological product.Describe what methods and components could be used to construct each type of building-Why is there a need for these incompatible methods and components? Merit CriteriaTask 7-Obtain a copy of RIBA current pattern of works, how does it work? What are its merits?The benefits of using the RIBA plan of work are that it is easily understood, it is a well-planned, coordinated structured approach.What are all the stages? How will the team members be coordinated to complete the project?RIBA Plan of worksfeasibleness phase-InceptionFeasibilityAt this stage of the plan, the architect will work closely with the client to chink and prepare the requir ements of the building project. Architects will leave behind clients with an appraisal and recommendation so that they can determine the form in which the project is to proceed, ensuring that it is feasible both in technical and financial terms.Pre-construction phase-Outline proposals Scheme design At this stage, the architect will usually have determined through sketch plans the layout, design and construction in order to obtain approval of the client on the outline proposals and accompanying report. To complete the outline and decide on particular proposals, including planning arrangements and appearance, constructional method, outline specification and cost, the architect will then draft plans and drawings for submission to the local authority to obtain all approvals such as building control and planning consent.Detail design At this stage, the architect will have to obtain final exam decisions on all matters related to design, specification, construction and cost. BVy creat ing working drawings and finalising the full designs of every part and component of the building, the architect draws unitedly the construction team. Meetingds of the team will take place to discuss and decide materials, finishings, services, contributions by specialist firms and a range of other matters relating to the finalising of the building. It is important that any changes or modifications to the scheme are noted and accommodated so that everyone can be updated and work from the latest drawings. Changes can be accommodates at this stage, although they whitethorn result in increased costs due to the scheme being planned on an early proposal.Production information This part of the plan includes the preparation of product information used in the building, the drafting of bills of quantities, tender documents and project planning materials such as the programme of works showing duration of activities and the time taken to create the building itself. This is a very important sta ge in the process and particular care must be taken to ensure accuracy of the work involved in drawings and specifications so that the contractors under winning the building work have all the necessary information to hand to complete the work to the appropriate standard. Drawings require at this stage include a location plan of where the work is found, a layout drawing of the construction site itself and a general arrangement drawing that shows the layout of the work to be done. From these drawings, a series of schedules and specifications will be drafted to provide any necessary additional information.Bills of quantity Specifications are dealt with in more detail later on, but their link with the bills of quantities is important. Bills of quantities are prepared by a quantity surveyor who reads the drawings and determines the quantities and amounts of materials needed to complete the constructions work. Any part of the building that is not yet finalised or has missing information can be allocated a provisionary or prime cost so that there is an amount for the work to take place is allocated even when the actual cost or amount to do this work may be finalised some time later. If the architect has not yet appointed a construction contractor or team to complete the works onsite, discussions at this stage will begin to determine an appropriate company or contractor to appoint who is capable of undertaking the work.Tender The idea of tendering is to allow the client an opportunity to present a batch of work or a construction contract to contractors who learn about the complexity, the stages of construction, the limits and the constraints anticipated at bottom the work so that a realistic and accurate price can be calculated by the contractors. The contractors then identify the price of the works and the client chooses the contractor best suited and able to do the work. Frequently, the cheapest tender or quote is selected as this can represent best value for t he client.For some work selective tendering may take place, where a architect and quantity surveyor invite contractors that are either cognize to them or have an established reputation for completing work similar to the one they are working on, to tender. Again, the cheapest quote is most commonly selected in this process.Contractors may be approached so that they tender an interest in the work. Sometimes a pre-tender meeting may be held with contractors and the complexity and the details of the work can be communicated to the contractors so that the contractors, the architect and he client can satisfy themselves that they are all capable of completing the work within the appointed timescale and budget. A letter of invitation to tender can then be issued together with all relevant drawings, specifications and bills the contractors can then visit the site of works and the contractor will determine and cost the project. Tenders are returned to the architect at an deemd date and ti me. Initial comparison of the tenders received from different contractors takes place by the architect and sometimes this includes the client or their representative. This analysis of the tenders usually results in the worst priced tender winning the contract and being appointed as the contractor.Construction phase-Project planning This is where the work to produce the building starts on the building itself. Contract documents are prepared and signed. At a project planning meeting, the architect will usually clarify any points undecided at this stage and agree anyfurther contractual points. Contractors draft a programme of works that illustrates the milestones and the total duration of the work. Key milestones include taking possession of the site, dates of the project progress meeting and other key dates that are achieved during the lifetime of the contract. The contractor is pass judgment to sign the contract documents at this stage, which includeA copy of the contractA full b ewilder of construction drawingsBills of quantitiesSpecificationsA register of drawingsSite diary and associated report formsSite operations The site is officially handed over to the contractor who can begin construction-related operations. The site is now the responsibility of the contractor who has to comply with all the legislative requirements and legal constraints. The contractor should be informed of any rights of way, preservation orders, protection requirements and any other environmental issues that need to be considered in terms of the work and the activities on site in the months ahead. the contractor has a duty to ensure the appropriate site supervision of all those involved in activities onsite. a clerk of works will check on behalf of the client and the architect that the contractor is complying and building the project to the appropriate standards of materials and workmanship. stresss are taken of various materials, sometimes by a specific quest from the architect and other times by established practice in some cases, such as the sampling of concrete which is regularly tested by way of a slump test to ensure workability when it arrives on site, and its strength assessed by testing to destruction samples at regular intervals after the concrete has been placed. brickwork panels are sometimes erected to enable the architect and the client to see what the brickwork will eventually look like. tiles, blocks, panels, etc. may also be subject to a request that the contractor builds a mock-up or sample panel for viewing by the architect and the client so that the quality and the desired finish of the work can be ascertained and ensured.The contractors duties at this stage of the plan are to work diligently on the construction works adhering to all relevant health, safety and welfare legislation. the contractor is also expected to cite a site diary to record relevant information about the progress of the construction works. typically, a site diary wi ll include information onweather conditionsvisitors on site for the percentage pointany deliveries of materials to siteprogress of work to datepersonnel onsite including subcontractorsany comments and notes taken about the work undertakenDiscrepancies and any inconsistencies in contract documents.Completion as the building starts to take shape, the contractor may be required to hand over part of the building to the client. the actual date of handover is planned and any great(p) issues relating to the construction works can be determined and a solution found. the period of notice required varies from site to site, but usually adequate notice is required in order to prepare the theater and any other supporting documentation. the client should be in a position to accept the building for its proper use so the architect will usually insist on inspecting the area and find out for themselves that the work is to the appropriate standard of materials and workmanship, that all services a nd equipment are functioning appropriately and effectively and that the as-built record drawings are a true record of the actual building. the building manual which in the case of a simple domestic dwelling or house will be simple could extend to a complex and detailed manual of several volumes for an industrial or more intricate commercial building. a certificate of practical completion can be issued by the architect to the contractor which then enables the contractor to claim monies due for the construction work and address any defects and snags that have arisen so far. at this stage, the contractor has effectively completed the construction stage and has no responsibilities for the insurance of the building or its works. When all defects or amendments or outstanding issues are addressed, the architect will issue a final certificate and the work out will be adjusted for variations, subsequent instructions and fluctuations in labour and materials prices and/or costsFeedback the f inal part of the riba plan is to analyse and evaluate the progress of what was expected with what was actually delivered. architects will need to determine what has happened in order to achieve recrudesce performance in the future. typically, an analysis and evaluation could include the following(a)what does the client think of the completed building?Does the building function effectively?What parts of the design were peculiarly successful or problematic?Could this design process have been undertaken differently and have provided a better service to the contractor or the client?What relationship and communication existed between the design team and the construction team? How could these be improved in the future?Did the contractor meet all the performance targets in a timely and effective manner?Did the design process run smoothly? If not, why?Was the job profitable and was the contract fulfilled?Why will my company use RIBA and what happens if it is altered or not adhered to.Why the company will use RIBA The riba plan is usually accepted as the most desirable plan, although many other types of plan are acceptable for smaller building projects or for instances where the riba plan may be too inflexible when conditions change frequently. The RIBA plan of work is cognize for being well planned, coordinated, and known for having a structured approach.Task 8-Compare the methods available for communication, for example, advantages and disadvantages of each. Explain why the contractor must implement these changesDistinction CriteriaTask 9 Analyse and discuss in detail the RIBA plan of work in terms of handling a design change after work has started. Evaluate the effectiveness of the plan from design to construction phase and provide examples of the plans flexibility to resolve changes of design quickly. Include how these changes are quantified.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment